[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939466":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},939466,606,2,"多选题","工程项目预评价的方法主要有( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","因果分析法",true,{"key":16,"text":17,"correct":14},"B","事故树分析法",{"key":19,"text":20,"correct":14},"C","事故模型法",{"key":22,"text":23,"correct":14},"D","度评价法",{"key":25,"text":26,"correct":27},"E","SWOT 分析法",false,"ABCD","常用预评价方法有： 1)事故致因因素评价方法：专家现场询问、观察法；危险和可操作性研究；故障类型及 影响分析；事故树分析；事故引发和发展分析；因果(鱼刺)图分析法等。 2)能够提供危险度分级的评价方法：危险和可操作性研究；故障类型及影响分析；事故 树分析；风险矩阵评价法；度评价法；重大危险源辨识方法；“检查表－危险指数评价 －系统分析”评价法；统计图表分析法等。 3)可以提供事故后果的评价方法：故障类型及影响分析；事故树分析；逻辑树分析；概 率理论分析；模糊矩阵法；易燃、易爆、有毒重大危险源评价法；统计图表分析法；事故模型法。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]