[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939442":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},939442,606,2,"多选题","工程项目环境影响评价的内容主要有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","环境资源评价",false,{"key":16,"text":17,"correct":18},"B","工程分析",true,{"key":20,"text":21,"correct":14},"C","环境保护措施评价",{"key":23,"text":24,"correct":18},"D","清洁生产评价",{"key":26,"text":27,"correct":18},"E","环境影响识别与预测","BDE","本题考查的是工程项目环境管理。工程项目环境影响评价的工作内容有工程分析、清洁生产评价、工程项目环境影响识别与预测。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]