[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939405":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},939405,606,1,"单选题","与工业产品相比，工程项目质量管理具有更多特点，下列表述错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工程项目形体庞大",false,{"key":16,"text":17,"correct":14},"B","工程项目的质量特性较多",{"key":19,"text":20,"correct":14},"C","工程项目质量影响因素多",{"key":22,"text":23,"correct":24},"D","工程项目质量具有透明性",true,"本题考查的是工程项目质量管理。选项D错误，工程项目质量具有隐蔽性。工程项目中分项工程交接多，中间产品多，隐蔽工程多，如不及时进行监督检查，事后很难发现内在的质量问题。因此，必须加强过程中的监督检查。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]