[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939400":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},939400,606,1,"单选题","全面质量管理活动的全部过程，就是质量计划的制订和组织实现的过程，这个过程就是 按照( )周而复始地运转。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计划-实施-检查-处理",true,{"key":16,"text":17,"correct":18},"B","实施-计划-检查-处理",false,{"key":20,"text":21,"correct":18},"C","计划-检查-实施-处理",{"key":23,"text":24,"correct":18},"D","计划-实施-处理-检查","全面质量管理活动的全部过程，就是质量计划的制订和组织实现的过程，这个过程 就是按照 PDCA 循环周而复始地运转。P(计划 PLAN)D(实施 DO)C(检查 CHECK)A(处理 ACT)。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]