[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939375":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},939375,606,1,"单选题","建设单位收到工程竣工报告后，由( )组织监理、施工、设计、勘察等单位项目负责人 进行单位工程验收",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","专业监理工程师",false,{"key":16,"text":17,"correct":14},"B","咨询工程师",{"key":19,"text":20,"correct":14},"C","总监理工程师",{"key":22,"text":23,"correct":24},"D","建设单位项目负责人",true,"建设单位收到工程竣工报告后，由建设单位项目负责人组织监理、施工、设计、勘 察等单位项目负责人进行单位工程验收。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]