[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939350":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},939350,606,2,"多选题","下列关于试运行质量管理的表述中，正确的有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","业主方应负责试运行现场的准备工作",false,{"key":16,"text":17,"correct":14},"B","承包方负责落实原材料的供应",{"key":19,"text":20,"correct":21},"C","试运行岗位人员应经过培训并考核合格",true,{"key":23,"text":24,"correct":21},"D","试运行一般分阶段进行",{"key":26,"text":27,"correct":21},"E","试运行工作应由业主方组织进行","CDE","本题考查的是工程项目试运行阶段的质量管理。承包方负责试运行现场的各项准备工作。业主方负责落实供应的资源，包括原材料、备品配件、燃料、水、电的供应。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]