[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939314":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},939314,606,2,"多选题","招标工程量清单中，其他项目清单内容包括( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","暂列金额",true,{"key":16,"text":17,"correct":14},"B","暂估价",{"key":19,"text":20,"correct":14},"C","计日工",{"key":22,"text":23,"correct":24},"D","规费和税金",false,{"key":26,"text":27,"correct":14},"E","总承包服务费","ABCE","其他项目清单：(1)暂列金额。(2)暂估价。(3)计日工。(4)总承包服务费。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]