[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939313":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},939313,606,2,"多选题","招标工程量清单应以单位(项)工程为单位编制，应由( )组成。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","分部分项工程量清单",true,{"key":16,"text":17,"correct":14},"B","措施项目清单",{"key":19,"text":20,"correct":14},"C","其他项目清单",{"key":22,"text":23,"correct":14},"D","规费和税金项目清单",{"key":25,"text":26,"correct":27},"E","单位工程量清单",false,"ABCD","招标工程量清单应以单位(项)工程为单位编制，应由分部分项工程量清单、措施项 目清单、其他项目清单、规费和税金项目清单组成。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]