[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939289":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},939289,606,2,"多选题","其他项目费包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","企业管理费",false,{"key":16,"text":17,"correct":18},"B","暂列金额",true,{"key":20,"text":21,"correct":18},"C","计日工",{"key":23,"text":24,"correct":14},"D","利润",{"key":26,"text":27,"correct":18},"E","总承包服务费","BCE","本题考查的是建筑安装工程费用项目的组成与计算。其他项目费包括暂列金额、计日工、总承包服务费。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]