[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939288":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},939288,606,2,"多选题","安全文明施工费的组成不包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","环境保护费",false,{"key":16,"text":17,"correct":14},"B","文明施工费",{"key":19,"text":20,"correct":21},"C","夜间施工增加费",true,{"key":23,"text":24,"correct":21},"D","脚手架工程费",{"key":26,"text":27,"correct":14},"E","临时设施费","CD","本题考查的是建筑安装工程费用项目的组成与计算。安全文明施工费的组成包括环境保护费、文明施工费、安全施工费、临时设施费。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]