[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939261":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},939261,606,2,"多选题","工程项目设备、工器具购置费由( )组成。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","设备安装费",false,{"key":16,"text":17,"correct":14},"B","设备试运转费",{"key":19,"text":20,"correct":21},"C","设备原价",true,{"key":23,"text":24,"correct":21},"D","工器具原价",{"key":26,"text":27,"correct":21},"E","运杂费","CDE","设备及工器具购置费由设备原价、工器具原价和运杂费(包括设备成套公司服务费) 组成。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]