[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939257":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},939257,606,1,"单选题","工程费用不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","设备及工器具购置费",false,{"key":16,"text":17,"correct":14},"B","建筑工程费",{"key":19,"text":20,"correct":14},"C","安装工程费",{"key":22,"text":23,"correct":24},"D","土地使用费",true,"本题考查的是工程项目总投资的组成。工程费用包括：建筑工程费、设备购置费和安装工程费。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]