[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939247":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},939247,606,2,"多选题","措施项目清单中的（ ）应按照国家或省级、行业建设主管部门的规定计价，不得作为竞争性费用。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","环境保护费",true,{"key":16,"text":17,"correct":14},"B","文明施工费",{"key":19,"text":20,"correct":21},"C","夜间施工增加费",false,{"key":23,"text":24,"correct":21},"D","脚手架工程费",{"key":26,"text":27,"correct":14},"E","临时设施费","ABE","本题考查的是工程量清单计价。措施项目清单中的安全文明施工费应按照国家或省级、行业建设主管部门的规定计价，不得作为竞争性费用。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]