[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939201":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},939201,606,1,"单选题","采用定额单价法编制施工图预算，计算人、料、机费用时( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","分项工程与定额单价完全一致时，直接套用定额单价",false,{"key":16,"text":17,"correct":14},"B","分项工程的主要材料品种与定额单价不一致时，按实际价格换算定额单价",{"key":19,"text":20,"correct":21},"C","分项工程施工工艺条件与定额单价不一致时，一般调价不换量",true,{"key":23,"text":24,"correct":14},"D","分项工程不能直接套用定额、不能换算和调整时，应编制补充定额单价","分项工程施工工艺条件与定额单价或单位估价表不一致而造成人工、机械的数量增 减时，一般调量不换价。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]