[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939156":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},939156,606,1,"单选题","确定为产生项目可交付成果而必须进行的具体工作，这是进度管理过程中的（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","规划进度管理",false,{"key":16,"text":17,"correct":18},"B","工作定义",true,{"key":20,"text":21,"correct":14},"C","工作顺序安排",{"key":23,"text":24,"correct":14},"D","进度计划制定","本题考查的是进度管理过程。工作定义：确定为产生项目可交付成果而必须进行的具体工作。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]