[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-939097":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},939097,606,1,"单选题","项目建设周期中，对整个工程项目总体投资的影响程度最重要是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","前期阶段",true,{"key":16,"text":17,"correct":18},"B","准备阶段",false,{"key":20,"text":21,"correct":18},"C","实施阶段",{"key":23,"text":24,"correct":18},"D","投产运营阶段","本题考查的是工作资源估算。工程项目前期阶段对整个工程项目总体投资的影响程度最重要。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]