[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938983":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},938983,606,1,"单选题","监理人在收到承包人进度付款申请单以及相应的支持性证明文件后的（ ）天内完成审查；发包人应在监理人收到进度付款申请单后的（ ）天内将进度应付款支付给承包人。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","7；7",false,{"key":16,"text":17,"correct":14},"B","7；14",{"key":19,"text":20,"correct":14},"C","14；14",{"key":22,"text":23,"correct":24},"D","14；28",true,"本题考查的是工程费用管理。监理人在收到承包人进度付款申请单以及相应的支持性证明文件后的14天内完成审查；发包人应在监理人收到进度付款申请单后的28天内将进度应付款支付给承包人。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]