[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938928":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},938928,606,2,"多选题","有关货物采购合同的开箱检验交货，下列说法正确的是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","开箱检验应在施工场地进行",true,{"key":16,"text":17,"correct":18},"B","卖方参加开箱检验费用由买方承担",false,{"key":20,"text":21,"correct":18},"C","如果卖方代表事先通知不能参加开箱检验，视为卖方接受买方开箱检验结果",{"key":23,"text":24,"correct":14},"D","开箱检验的检验结果不能对抗在合同设备的安装、调试、考核、验收中发现的合同设备质量问题",{"key":26,"text":27,"correct":14},"E","开箱检验的检验结果不能免除卖方负有的设备质量责任","ADE","本题考查的是设备采购合同的主要内容。合同设备的开箱检验应在施工场地进行。开箱检验由买卖双方共同进行，卖方应自负费用派遣代表到场参加开箱检验。如果卖方代表未能依约或按买方通知到场参加开箱检验，买方有权在卖方代表未在场的情况下进行开箱检验，并签署数量、外观检验报告，对于该检验报告和检验结果，视为卖方已接受，但卖方确有合理理由且事先与买方协商推迟开箱检验时间的除外。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]