[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938893":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},938893,606,1,"单选题","根据《标准设备采购招标文件》，由于买方原因在最后一批合同设备交货后( )个月内 未能开始考核，则买卖双方应在上述期限届满后 7 日内签署验收款支付函。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","3",false,{"key":16,"text":17,"correct":18},"B","6",true,{"key":20,"text":21,"correct":14},"C","9",{"key":23,"text":24,"correct":14},"D","12","由于买方原因在最后一批合同设备交货后 6 个月内未能开始考核，则买卖双方应在 上述期限届满后 7 日内签署验收款支付函。卖方有义务在验收款支付函签署后 6 个月内应买方要 求提供不超出合同范围的技术服务。在上述 6 个月的期限内，如合同设备经过考核达到或视为达 到技术性能考核指标，则买卖双方应按照合同约定签署合同设备验收证书。 4",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]