[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938722":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},938722,606,1,"单选题","国内采购工程咨询服务时使用的评标方法一般为( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","基于质量和费用的选择",false,{"key":16,"text":17,"correct":14},"B","最低费用的选择",{"key":19,"text":20,"correct":14},"C","单一来源的选择",{"key":22,"text":23,"correct":24},"D","综合评估法",true,"国内采购工程咨询服务时使用的评标方法一般为综合评估法。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]