[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938643":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},938643,606,2,"多选题","影响项目组织的社会因素包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","项目规模与项目技术复杂性",true,{"key":16,"text":17,"correct":14},"B","项目的经济合同关系与形式",{"key":19,"text":20,"correct":14},"C","项目管理的范围",{"key":22,"text":23,"correct":24},"D","上级组织的管理模式与制度",false,{"key":26,"text":27,"correct":24},"E","公司与项目管理目标","ABC","本题考查的是组织与组织计划的含义。影响项目组织的社会因素包括：（1）国际通行的项目管理方法与惯例；（2）国家经济管理环境和与项目相关的管理制度；（3）项目规模与项目技术复杂性；（4）项目的经济合同关系与形式；（5）项目管理的范围以及项目工作的种类、规模、性质和影响力。而上级组织的管理模式与制度、公司与项目管理目标属于影响项目组织的组织内部因素。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]