[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938620":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},938620,606,1,"单选题","项目经理接受项目任务后，首先要了解项目情况，（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","研究工作任务",true,{"key":16,"text":17,"correct":18},"B","分析项目相关人员",false,{"key":20,"text":21,"correct":18},"C","编制项目工作计划",{"key":23,"text":24,"correct":18},"D","成立项目团队","本题考查的是项目经理。项目经理接受项目任务后，首先要了解项目情况，研究工作任务，拟定初步的工作思路。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]