[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938569":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},938569,606,1,"单选题","在影响管理幅度因素分级表中，职能复杂多变的点值为（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","2",false,{"key":16,"text":17,"correct":14},"B","4",{"key":19,"text":20,"correct":14},"C","6",{"key":22,"text":23,"correct":24},"D","8",true,"本题考查的是项目管理组织的基本原理。职能复杂多变的点值为 8。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]