[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938560":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},938560,606,1,"单选题","（ ）主要考核成员在规定的时间内完成工作任务的情况，考核主要目的是为了保证项目进度计划顺利完成。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工作效率",true,{"key":16,"text":17,"correct":18},"B","工作纪律",false,{"key":20,"text":21,"correct":18},"C","工作质量",{"key":23,"text":24,"correct":18},"D","工作成本","本题考查的是项目团队考核。工作效率主要考核成员在规定的时间内完成工作任务的情况，考核主要目的是为了保证项目进度计划顺利完成。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]