[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938459":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},938459,606,1,"单选题","项目团队的一些特殊人员必须按照委托方要求来设定岗位，这种人员配备方式属于（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","内部招聘",false,{"key":16,"text":17,"correct":14},"B","外部招聘",{"key":19,"text":20,"correct":21},"C","预安排",true,{"key":23,"text":24,"correct":14},"D","商谈","本题考查的是人员吸纳。预安排，即在一些情况下，人员可能被预先安排好了。例如：（1）项目是一个竞争性建议的结果，特别的人员已作为建议书的一部分被确定了；（2）项目是一个内部服务项目，人员安排在项目的有关批准文件中已被确定；（3）项目委托方对项目人员有特殊要求，项目团队的一些特别人员必须按委托方要求来安排。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]