[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938427":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},938427,606,2,"多选题","项目经理对项目相关人员进行分析，可以有效地（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","开展协调工作",true,{"key":16,"text":17,"correct":14},"B","识别和确定与项目相关的关键人员",{"key":19,"text":20,"correct":21},"C","进行项目结构分解",false,{"key":23,"text":24,"correct":14},"D","选定项目团队成员",{"key":26,"text":27,"correct":21},"E","制订项目管理制度","ABD","本题考查的是项目经理。分析相关人员的作用：（1）使项目经理对项目所涉及的各方面关系做到心中有数，以利于今后的协调工作；（2）可以更好地确定项目的方向，有助于原方案中不合理内容的调整；（3）通过对项目相关人群的分析，可以识别哪些是驱动者、支持者和观察者，并确定项目的相关关键人员；（4）通过相关人员分析，有利于确定项目团队的成员，有助于安排项目团队成员的工作任务。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]