[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938416":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},938416,606,1,"单选题","工程项目环境影响评价的内容不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","环境资源评价",true,{"key":16,"text":17,"correct":18},"B","工程分析",false,{"key":20,"text":21,"correct":18},"C","环境影响识别与预测",{"key":23,"text":24,"correct":18},"D","清洁生产评价","本题考查的是工程项目环境影响评价。工程项目环境影响评价的工作内容包括三部分：工程分析、清洁生产评价、工程项目环境影响识别与预测",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]