[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938406":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},938406,606,2,"多选题","工程项目环境影响评价的工作内容有( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","工程施工",false,{"key":16,"text":17,"correct":18},"B","工程分析",true,{"key":20,"text":21,"correct":18},"C","清洁生产评价",{"key":23,"text":24,"correct":14},"D","工程项目环境影响的分析与调整",{"key":26,"text":27,"correct":18},"E","工程项目的环境影响识别与预测","BCE","工程项目环境影响评价的工作内容主要有三部分，即①工程分析、②清洁生产评价、 ③工程项目的环境影响识别与预测。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]