[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938361":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},938361,606,2,"多选题","工程项目质量管理的基本方法有( )。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","三阶段控制法",true,{"key":16,"text":17,"correct":14},"B","三全控制法",{"key":19,"text":20,"correct":21},"C","WBS 法",false,{"key":23,"text":24,"correct":14},"D","PDCA 循环管理法",{"key":26,"text":27,"correct":21},"E","网络图法","ABD","工程项目质量管理的基本方法：三阶段控制法、三全控制法、PDCA 循环管理法。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]