[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938340":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},938340,606,2,"多选题","暂列金额包括（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","不可预见的材料、工程设备采购费",true,{"key":16,"text":17,"correct":14},"B","施工中可能发生的工程变更费用",{"key":19,"text":20,"correct":21},"C","零星工程费",false,{"key":23,"text":24,"correct":14},"D","索赔费用",{"key":26,"text":27,"correct":21},"E","现场管理费","ABD","本题考查的是建筑安装工程费用项目的组成与计算。暂列金额：是指发包人在工程量清单中暂定并包括在工程合同价款中的一笔款项。用于施工合同签订时尚未确定或者不可预见的所需材料、工程设备、服务的采购，施工中可能发生的工程变更、合同约定调整因素出现时的工程价款调整以及发生的索赔、现场签证确认等的费用",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]