[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938338":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},938338,606,2,"多选题","工程量计算的评审包括（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","审查工程量计算规则的选用是否正确",true,{"key":16,"text":17,"correct":14},"B","审查工程量的计算是否存在重复计算现象",{"key":19,"text":20,"correct":14},"C","审查工程量汇总计算是否正确",{"key":22,"text":23,"correct":24},"D","审查是否按照有关规定计取企业管理费、规费及税金",false,{"key":26,"text":27,"correct":24},"E","审查材料价格的计取是否正确","ABC","本题考查的是施工图预算的编制与审查。工程量计算的评审包括：（1）审查工程量计算规则的选用是否正确；（2）审查工程量的计算是否存在重复计算现象；（3）审查工程量汇总计算是否正确；（4）审查施工图设计中是否存在擅自扩大建设规模、提高建设标准等现象。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]