[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938331":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},938331,606,1,"单选题","暂估材料或工程设备的单价确定后，在综合单价中( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","只应取代原暂估单价",true,{"key":16,"text":17,"correct":18},"B","应取代原暂估单价并考虑企业管理费变动",false,{"key":20,"text":21,"correct":18},"C","应取代原暂估单价并考虑利润变动",{"key":23,"text":24,"correct":18},"D","应取代原暂估单价并考虑规费和税金变动","暂估材料或工程设备的单价确定后，在综合单价中只应取代原暂估单价，不应再在 综合单价中涉及企业管理费或利润等其他费的变动。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]