[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938266":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},938266,606,2,"多选题","根据《标准勘察招标文件》，发包人要求勘察人进行( )时，相应费用不含在合同 价格之中，由发包人另行支付。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","试验检测",true,{"key":16,"text":17,"correct":14},"B","外出考察",{"key":19,"text":20,"correct":14},"C","专项咨询",{"key":22,"text":23,"correct":14},"D","专家评审",{"key":25,"text":26,"correct":27},"E","环境保护",false,"ABCD","发包人要求勘察人进行外出考察、试验检测、专项咨询或专家评审时，相应费用不 含在合同价格之中，由发包人另行支付。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]