[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938192":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},938192,606,1,"单选题","关于工程项目开标的说法，正确的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","开标时间应与提交投标文件的截止时间一致",true,{"key":16,"text":17,"correct":18},"B","开标时应邀请能参加开标的部分投标人参加",false,{"key":20,"text":21,"correct":18},"C","开标时应由招标人或其代表检查投标文件密封情况",{"key":23,"text":24,"correct":18},"D","开标后收到的投标文件也应当众拆封、宣读","开标应由招标人主持，邀请所有投标人参加。开标时，由投标人或者其推选的代表 检查投标文件的密封情况，也可以由招标人委托的公证机构检查并公证。招标人在招标文件要求 提交投标文件的截止时间前收到的所有投标文件，开标时都应当当众予以拆封、宣读。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]