[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938181":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},938181,606,1,"单选题","对项目团队成员考核的内容不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工作效率",false,{"key":16,"text":17,"correct":14},"B","工作纪律",{"key":19,"text":20,"correct":14},"C","工作质量",{"key":22,"text":23,"correct":24},"D","工作责任",true,"本题考查的是项目团队考核。对项目团队成员考核的内容包括：（1）工作效率；（2）工作纪律；（3）工作质量；（4）工作成本。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]