[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938147":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},938147,606,2,"多选题","项目团队考核的内容包括( )。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","工作效率",true,{"key":16,"text":17,"correct":14},"B","工作纪律",{"key":19,"text":20,"correct":14},"C","工作质量",{"key":22,"text":23,"correct":14},"D","工作成本",{"key":25,"text":26,"correct":27},"E","工作动力",false,"ABCD","项目团队考核的内容主要有：工作效率、工作纪律、工作质量、工作成本。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]