[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938127":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},938127,606,1,"单选题","项目的建设条件和自然条件在项目实施过程中可能发生变化，体现了（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工程项目交易过程的复杂性",false,{"key":16,"text":17,"correct":14},"B","工程项目生产过程的复杂性",{"key":19,"text":20,"correct":14},"C","工程项目组织的复杂性",{"key":22,"text":23,"correct":24},"D","工程项目环境的复杂性",true,"本题考查的是工程项目的概念。项目的建设条件和自然条件在项目实施过程中可能发生变化，体现了工程项目环境的复杂性。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]