[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938126":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},938126,606,1,"单选题","过程管理国际标准化组织(ISO)和国际咨询工程师联合会(FIDI C)推荐采用国际通用的( )方法。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计划→实施→检查→处理",true,{"key":16,"text":17,"correct":18},"B","计划→指挥→监督→检查",false,{"key":20,"text":21,"correct":18},"C","指挥→监督→运转→协调",{"key":23,"text":24,"correct":18},"D","计划→沟通→指挥→协调","过程管理国际标准化组织(ISO)和国际咨询工程师联合会(FIDIC)推荐采用国际通用的 PDCA 循环方法。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]