[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938099":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},938099,606,2,"多选题","（2014年真题）进行工程项目环境影响评价需要预测工程项目给环境带来的影响，预测的内容主要有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","项目影响环境质量的变化量",true,{"key":16,"text":17,"correct":18},"B","项目影响环境等级标准的变化量",false,{"key":20,"text":21,"correct":14},"C","项目影响环境空间的变化范围",{"key":23,"text":24,"correct":18},"D","环境保护措施加强后项目收益的增加量",{"key":26,"text":27,"correct":14},"E","项目对环境影响的时段","ACE","本题考查的是工程项目环境管理的含义和环境影响评价。影响的预测是在影响识别确定可能是重大环境影响后，预测工程项目对环境产生影响、导致环境质量或环境质量价值的变化量、空间变化范围、时间变化阶段等。参见教材P384。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]