[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938095":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},938095,606,1,"单选题","（2017年真题）工程项目安全预评价是在工程项目的（ ）阶段开展的一项工作。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","可行性研究",true,{"key":16,"text":17,"correct":18},"B","初步设计",false,{"key":20,"text":21,"correct":18},"C","施工",{"key":23,"text":24,"correct":18},"D","竣工验收","本题考查的是工程项目前期阶段的安全管理。工程项目的安全预评价工作应在项目可行性研究阶段进行。参见教材P374。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]