[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938060":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},938060,606,1,"单选题","（2010年真题）工程项目设计过程质量管理中，设计策划通常以( )的形式编制。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目设计方案",false,{"key":16,"text":17,"correct":18},"B","项目设计计划",true,{"key":20,"text":21,"correct":14},"C","项目设计图纸",{"key":23,"text":24,"correct":14},"D","项目设计流程","设计策划是指根据合同建立质量目标、规定质量控制要求、安排开展各项设计活动的计划；设计评审是指对设计能力和结果的充分性和适宜性进行评价的活动； 设计验证是指为确保设计输出满足输入的要求，依据所策划的安排对工程设计进行的认可活动； 设计确认是指为确保产品能够满足规定的使用要求或已知用途的要求，依据所策划的安排对工程设计进行的认可活动； 设计变更是指设计单位依据建设单位要求对原设计内容进行的修改、完善和优化。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]