[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938051":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},938051,606,1,"单选题","（2006年真题）建立工程项目质量管理体系的步骤不包括 ( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","结合项目工作结构的分解，层层分解质量目标",false,{"key":16,"text":17,"correct":14},"B","制定工程项目的质量计划",{"key":19,"text":20,"correct":21},"C","制定成品质量检验制度",true,{"key":23,"text":24,"correct":14},"D","明确各层次的质量管理目标","",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]