[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938017":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},938017,606,1,"单选题","（2012年真题）环境保护费、文明施工费、安全施工费、临时设施费合并称为( )",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","环境文明施工费",false,{"key":16,"text":17,"correct":14},"B","环保安全施工费",{"key":19,"text":20,"correct":14},"C","环保、安全文明施工费",{"key":22,"text":23,"correct":24},"D","安全文明施工费",true,"",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]