[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-938007":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},938007,606,1,"单选题","（2014年真题）设计概算的编制依据不包括( )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程项目资金筹措方案",false,{"key":16,"text":17,"correct":18},"B","设计合同",true,{"key":20,"text":21,"correct":14},"C","工程勘察与设计文件",{"key":23,"text":24,"correct":14},"D","施工组织设计和施工方案","",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]