[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-937964":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},937964,606,1,"单选题","（2012年真题）工程项目投资建设各阶段中，资源消耗量最大的是项目( )阶段。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","决策",false,{"key":16,"text":17,"correct":14},"B","准备",{"key":19,"text":20,"correct":21},"C","实施",true,{"key":23,"text":24,"correct":14},"D","竣工","工程项目实施阶段 施工所需资源的费用往往占工程总费用的 80%以上。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]