[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-937963":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},937963,606,1,"单选题","（2017年真题）在工程项目建设中，普通人员及材料设备的需要量高峰值通常出现在( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","前期",false,{"key":16,"text":17,"correct":14},"B","准备",{"key":19,"text":20,"correct":21},"C","实施",true,{"key":23,"text":24,"correct":14},"D","试生产及竣工验收","工程项目实施阶段 施工所需资源的费用往往占工程总费用的 80%以上。",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]