[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-937933":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},937933,606,2,"多选题","（2010年真题）工程项目材料采购合同条款主要涉及材料的( )等。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","交接程序",true,{"key":16,"text":17,"correct":14},"B","检验方式",{"key":19,"text":20,"correct":21},"C","性能保修",false,{"key":23,"text":24,"correct":14},"D","质量要求",{"key":26,"text":27,"correct":21},"E","安装调试","ABD","材料采购合同的条款一般限于材料交货阶段，主要涉及交接程序、检验方式和质量要求、合同价款的支付等。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]