[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-937705":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},937705,606,2,"多选题","（2013年真题）建立工程项目目标系统，确定可执行目标一般是在项目的（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","建议书阶段",false,{"key":16,"text":17,"correct":18},"B","可行性研究阶段",true,{"key":20,"text":21,"correct":14},"C","机会研究阶段",{"key":23,"text":24,"correct":18},"D","技术设计阶段",{"key":26,"text":27,"correct":14},"E","竣工验收阶段","BD","本题考查的是工程项目管理的基本原理。可执行目标一般在可行性研究以及技术设计和计划中形成，并得到进一步解释和定量化，逐渐转化为具体的工作任务。",{"id":6,"name":31,"category":32,"favorite":33},"工程项目组织与管理","建筑工程",0]