[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-937694":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},937694,606,1,"单选题","（2009年真题）明确实现目标的具体操作过程，是工程项目过程控制基本程序中( )阶段的工作。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","实施",false,{"key":16,"text":17,"correct":14},"B","检查",{"key":19,"text":20,"correct":14},"C","处理",{"key":22,"text":23,"correct":24},"D","计划",true,"",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]