[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-937690":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},937690,606,1,"单选题","（2013年真题）对于政府直接投资项目，政府的要求和期望不包括( )",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","质量合格",false,{"key":16,"text":17,"correct":18},"B","松弛的工作进度",true,{"key":20,"text":21,"correct":14},"C","投资适当",{"key":23,"text":24,"correct":14},"D","符合国家规划","",{"id":6,"name":27,"category":28,"favorite":29},"工程项目组织与管理","建筑工程",0]